  • We have developed an in-house Scheduler which is based on Rate-monotonic scheduling. We have 6 tasks (5 actual tasks and 1 idle task). Our scheduler works on 1msec timer interrupt. Before sending it out in real world, We want to test it thoroughly.

    What are the best and/or commonly used strategies for testing a Scheduler?

    One thing we performed was added functions which require very high processing time in each tasks and checked whether scheduler still switches on given deadline or not. But I feel this is not enough to gain the confidence.



  • Here's some ideas from similar tests:

    1. Randomize, you are not smarter then the designer so don't try to find the hole in the design- randomize your tests

    2. Vary load conditions from light to 100%+ on each task and on all of them together

    3. Look for producer-consumer situations that can hang tasks

    4. Look for accesses to peripherals and IO

    The bottom line is that you can't test your scheduler directly (at least no cost-effectively) so you have to exercise it from the outside.